Public Health Sudbury & Districts offers additional planning services to both municipalities and individuals with regards to the OBC’s Part 8 requirements for suitability of sites. If you have a report of an illegal or malfunctioning septic system please call Public Health Sudbury & Districts at 705.522.9200 (toll-free 1.866.522.9200) and speak to a public health inspector. When a malfunctioning system is confirmed, an order may be issued under Part 8 of the Ontario Building Code. Public health inspectors investigate all reported complaints regarding malfunctioning septic systems. Generally, three inspections are required for new systems.
![ontario building code waterfront septic ontario building code waterfront septic](https://buildersontario.com/wp-content/uploads/2015/03/septic-tank.png)
Permits are also required for sewage system replacements or modifications. Sewage system permits for all classes of systems are required for new installations except Class 1 systems (i.e. Permit application review and sewage system permits Public Health Sudbury & Districts regulates and ensures compliance with the Ontario Building Code regarding the installation and maintenance of private onsite sewage systems.īy properly maintaining and caring for your sewage system you are helping to protect lakes, rivers, and streams, as well as ground water, which are vital resources to us all. What is Public Health Sudbury & Districts role? Please speak to a public health inspector at Public Health Sudbury & Districts if you have questions regarding Class 5 systems by calling 705.522.9200 (toll-free at 1.866.522.9200). Please note: Class 5 sewage systems are only allowed under certain circumstances, where a Class 4 sewage system is not appropriate due to lot limitations.
#Ontario building code waterfront septic install
A permit is required to install this type of septic system. Class 5Ī sewage system using a holding tank for the retention of on-site sewage and must be emptied by a licensed sewage hauler. Class 4Ī sewage system which consists of a treatment unit (generally a septic tank) and a leaching bed system. Class 3Ī sewage system, cesspool is used for the disposal of human body wastes such as waste from a composting toilet or privy. A permit is required to install this type of septic system with specifications of a Class 2 system. Class 2Ī leaching pit used for disposal of grey water, (sink, tub, shower, and laundry waste).
![ontario building code waterfront septic ontario building code waterfront septic](https://www.rideaulakes.ca/media/k2/items/cache/218fa54275e0e31c37b4e5091d9112ba_XL.jpg)
However, they still require proper installation according to the Ontario Building Code. A permit is not required for the construction of a Class 1 sewage system and, as such, a person is exempt from the permit process. Classifications of sewage systems Class 1Ī sewage system used for the disposal of human body wastes (no added water) and includes all forms of privy or outhouse. This includes unorganized territories within those districts. Public Health Sudbury & Districts is designated under the OBC to conduct inspections and issue sewage system permits across the Sudbury and Manitoulin districts. In Ontario, the requirements for construction and maintenance of sewage systems with a design daily sewage flow of less than 10,000 litres per day are regulated under the Ontario Building Code (OBC). Pump out your septic tank at least once every two to three years. Upon review of the application, the Building Inspector may require further documentation or clarification.Home » Health Topics & Programs » Sewage Systems Sewage Systems The items in the above list may be required for a complete permit application.
![ontario building code waterfront septic ontario building code waterfront septic](https://www.napoleon.cc/wp-content/uploads/2015/07/Knob-Tube-Connected-to-Romex.jpg)
Heat Loss/Gain, Duct Design and Ventilation design completed by Qualified HRAI Designer.Site plan including location of proposed building, septic system, other buildings on the property, distances to lot lines, distances to high water mark, drainage plan.All building permit applications can be sent to: Forms Required All additional forms can be found in the Additional Forms section below. The only thing that varies per application is the required forms and information. All building permits use the same application form.